
A recent operation, carried out a few days ago by PLANIR Port Operator in collaboration with Christophersen Maritime Agency. The operation took place at Pier C of the Port of Montevideo, where the yacht Trindade was unloaded of the deck of the ´Industrial Challenger´ vessel.
Preparations for this operation began at around 10:00 AM, with everything set for the initial maneuvers. The unloading took about 2 hours, involving the tensioning of straps, hoisting, ballasting, and lowering it in tandem into the water. Subsequently, the yacht sailed to Piriápolis for maintenance tasks.
It was a successful and safe operation.